• Cone Zone Report 10-18 through 10-24

    Here are the major scheduled road and lane closures for Monterey County from Sun., Oct. 18 through Sat., Oct. 24. Keep in mind that construction work is weather-dependent.

    Hwy 1 – Gorda to Ragged Point
    Major retaining wall construction project: daytime traffic control and full night time closures of Hwy 1 between Gorda and Ragged Point from 10 p.m. to 7 a.m. Night work Sunday nights through Friday mornings.
    Motorists traveling north/south of these closures are advised to reach their destinations before 10 p.m.
    All local businesses along the coast will remain open during the roadwork.
    Expect daytime delays of about 10 minutes.
    Hwy 1 – South of Lucia
    A ½-mile project to construct a viaduct will result in one-way signalized traffic control, 24/7, 18 miles south of Big Sur near Lucia from south of Big Creek Bridge to south of Dolan Creek Bridge.
    All local businesses along the coast will remain open during the roadwork.
    Expect daytime delays of about 15 minutes.
    Hwy 1 – Bridge Repair Work: October 19 – October 23
    Bridge repair work on Hwy 1 at multiple locations between Willow Creek Bridge and Castro Canyon Bridge from 7 a.m. to 4 p.m.
    Hwy 1 – Big Sur: October 19 – October 23
    Daytime drainage clearing along Hwy 1 between the Molera Park entrance and Garrapata Creek Bridge from 8:30 a.m. to 3 p.m.
    PG&E Gas Line Replacement Project – Hwy 68 between Salinas & Monterey
    Gas line replacement work will result in night time lane closures along eastbound and westbound Hwy 68 between Olmstead Road and Josselyn Canyon Road from 8 p.m. to 5 a.m.
    Hwy 101 – King City: October 19 – October 23
    Daytime tree removal along the southbound lane of Hwy101 between Central Ave. and Hobson Ave.from 6 a.m. to 3 p.m. One lane will be closed for the tree removal.
    Expect daytime delays of about 10 minutes.
    Hwy 101 – King City to Salinas: October 19 – October 23
    Daytime and night time bridge work along Hwy 101 from King City to Alisal St. in Salinas.
    Hwy 183 – Salinas to Castroville: October 21 – October 22
    Daytime chip seal work along Hwy 183 between Old Cemetery Rd and Cooper Rd. from 8 a.m. and 3 p.m.
    Traffic control consists of one-way reversing traffic control with flagging
    Expect delays of about 15 minutes.
    Salinas: Hitchcock Road Traffic Signal Project
    A project to install traffic signals and realign a portion of Hwy 68 at Hitchcock Rd. continues.
    The #2 (right) lane of westbound Hwy. 68 will be closed at this location Monday through Thursday from 8 am until 6 pm and from 8 am until 4 pm on Fridays.
    Expect delays not too exceed 10 minutes.
    Salinas: East Alisal Street/Skyway Boulevard Roundabout Project
    The City of Salinas is constructing its first modern Roundabout at the East Alisal/Skyway intersection in Salinas.  Modern roundabouts generally provide the most efficient way of managing traffic through an intersection, while providing the benefits of fewer conflict points between pedestrians and motorists, which enhances pedestrian safety, reduces congestion and average vehicle delay, generating less pollution (via fewer vehicle stops and starts).
    Current work consists of completing the irrigation and landscape improvements.
    Expect 5-10 minute delays.
    Salinas: Sanborn Road Waterline Project: Fairview Ave. – Eucalyptus Dr.
    Small localized lane closures as crews wrap up this large project.

    posted to Cedar Street Times on October 16, 2015

    Topics: Front PG News

    Comments

    You must be logged in to post a comment.



  • Cedar Street’s Most Popular

  • Beach Report Card

    Loading...

    This is the Heal the Bay Beach Report Card for Monterey Peninsula beaches, which reports water quality grades, or when relevant, weather advisories. An A to F grade is assigned based on the health risks of swimming or surfing at that location. Look at the "dry" grade for all days except those "wet" days during and within 3 days after a rainstorm. Click here for more information on the Beach Report Card. Click the name of the beach when it pops up for more details, or choose a beach below.

    AsilomarCarmelLovers PointMunicipal Wharf 2 (Monterey)Upper Del Monte Beach (Monterey)San Carlos Beach (Cannery Row)Stillwater Cove (Pebble Beach)Spanish Bay

    adapted from Heal the Bay, brc.healthebay.org
    subscribe via RSS
    stay safe on the go: app for iOS or Android