• Cone Zone Report 7/12-19/15

    Here are the major scheduled road and lane closures for Monterey County from Sunday, July 12 through Sunday, July 19, 2015Please keep in mind that construction work is weather-dependent.

    Highway 1 – Gorda to Ragged Point: July 12 – July 17

    • A major retaining wall construction project will result in daytime traffic control and full night time closures of Highway 1 between Gorda and Ragged Point from 10 p.m. to 7 a.m.
    • Night work will take place Sunday nights through Friday mornings.
    • Motorists traveling north/south of these closures are advised to reach their destinations before 10 p.m.
    • All local businesses along the coast will remain open during the roadwork.
    • Motorists should expect daytime delays of approximately 10 minutes. 

    Highway 1 – Big Sur Coast: July 13 – July 17

    • Daytime pavement work along Highway 1 between the Ventana Entrance and Garrapata Creek Bridge from 8 a.m. to 3 p.m.
    • Motorists should expect delays of approximately 10 minutes. 

    Highway 1 – Big Sur Coast: July 14 – July 16

    • Daytime mowing along Highway 1 between Malpaso Creek Bridge and Rio Road from 9 a.m. to 2 p.m.
    • Motorists should expect delays of approximately 10 minutes. 

    PG&E Gas Line Replacement Project – Highway 68: July 12 – July 18

    • Gas line replacement work will result in night time lane closures along eastbound and westbound Highway 68 between Olmsted Road and San Benancio Road from 8 p.m. to 5 a.m.
    • Motorists can expect delays of approximately 15 minutes

    Highway 101 – Greenfield: July 13 – July 17

    • Daytime pavement and ramp work along northbound and southbound Highway 101 between Lagomarsino Avenue and Hudson Road from 6 a.m. to 5 p.m.
    • Motorists should expect delays of approximately 10 minutes. 

    Highway 101 – Salinas: July 15 – July 16

    • Daytime bridge work along northbound Highway 101 at John Street will result in the temporary closure of the northbound John Street on-ramp and northbound Highway 101 #2 lane from 9 a.m. to 2 p.m.
    • Motorists should expect delays of approximately 15 minutes. 

    Highway 198 – San Lucus: July 13 & July 17

    • Daytime pavement work along Highway 198 between Freeman Flat Road and Pine Valley Road from 8:15 a.m. to 3:30 p.m.
    • Motorists should expect delays of approximately 10 minutes.

    River Road Overlay Project

    • Daytime pavement work along River Road between Parker Road and Chualar River Road from 7:30 a.m. to 5 p.m., Monday through Friday.
    • Motorists are encouraged to seek an alternate route.
    • The project is currently scheduled for completion by August 31.
    • Motorists should expect delays of approximately 10 minutes. 

    Salinas: East Alisal Street—Skyway Boulevard Roundabout Project

    The City of Salinas has contracted with Anderson Pacific Engineering Construction, Inc. to construct the first modern roundabout in Salinas, located at the intersection of East Alisal Street and Skyway Boulevard, adjacent to Firehouse Recreation Center and Fairways Golf Course, and roughly 0.6 miles north of the Salinas Municipal Airport.

    Work within the intersection necessitates re-routing traffic during the 2.5-month construction period.  The project is currently on schedule, with the intent of having an operational intersection before the California International Airshow at the Salinas Municipal Airport on September 26 and 27, 2015.

    Motorists are encouraged to re-route around the area, or be detoured around the intersection, resulting in 5 to 10-minute delays, depending upon the time of day.

     

    posted to Cedar Street Times on July 10, 2015

    Topics: Front PG News

    Comments

    You must be logged in to post a comment.



  • Cedar Street’s Most Popular

  • Beach Report Card

    Loading...

    This is the Heal the Bay Beach Report Card for Monterey Peninsula beaches, which reports water quality grades, or when relevant, weather advisories. An A to F grade is assigned based on the health risks of swimming or surfing at that location. Look at the "dry" grade for all days except those "wet" days during and within 3 days after a rainstorm. Click here for more information on the Beach Report Card. Click the name of the beach when it pops up for more details, or choose a beach below.

    AsilomarCarmelLovers PointMunicipal Wharf 2 (Monterey)Upper Del Monte Beach (Monterey)San Carlos Beach (Cannery Row)Stillwater Cove (Pebble Beach)Spanish Bay

    adapted from Heal the Bay, brc.healthebay.org
    subscribe via RSS
    stay safe on the go: app for iOS or Android