• Cone Zone Report 7/19-7/26/15

    Scheduled road and lane closures for Monterey County from Sunday, July 19 through Sunday, July 26, 2015. Please keep in mind that construction work is weather-dependent.

    Highway 1 – Gorda to Ragged Point: July 19 – July 24

    • A major retaining wall construction project will result in daytime traffic control and full night time closures of Highway 1 between Gorda and Ragged Point from 10 p.m. to 7 a.m.
    • Night work will take place Sunday nights through Friday mornings.
    • Motorists traveling north/south of these closures are advised to reach their destinations before 10 p.m.
    • All local businesses along the coast will remain open during the roadwork.
    • Motorists should expect daytime delays of approximately 10 minutes. 

    PG&E Gas Line Replacement Project – Highway 68: July 19 – July 24

    • Gas line replacement work will result in night time lane closures along eastbound and westbound Highway 68 between Olmsted Road and San Benancio Road from 8 p.m. to 5 a.m.
      •Motorists can expect delays of approximately 15 minutes

    River Road Overlay Project

    • Daytime pavement work along River Road between Parker Road and Chualar River Road from 7:30 a.m. to 5 p.m., Monday through Friday.
    • Motorists are encouraged to seek an alternate route.
    • The project is currently scheduled for completion by August 31.
    • Motorists should expect delays of approximately 10 minutes. 

    Salinas: East Alisal Street/Skyway Boulevard Roundabout Project

    All underground work has been completed.  Demolition for splitter island and bio-swales is 90% complete, and the contractor, Anderson Pacific Engineering of Santa Clara, will be starting street reconstruction work next week (a 2+ week effort).  The project is on schedule for operational completion by the California International Airshow in Salinas (September 26 and 27). Traffic detours around the intersection are in effect.  Motorists should expect 5-10 minute delays.

    Salinas: Industrial Waste Pipeline Project on Blanco Road:  

    The pipeline is fully installed and the westbound traffic closure has been removed.  Two-way traffic with 2 lanes in each direction has been re-established on Blanco Road.  Final striping for the westbound lanes will occur today.  Thus, the project is essentially complete and traffic is back to “normal”.  No additional impacts to traffic are expected for this project.

     

    posted to Cedar Street Times on July 17, 2015

    Topics: Front PG News

    Comments

    You must be logged in to post a comment.



  • Cedar Street’s Most Popular

  • Beach Report Card

    Loading...

    This is the Heal the Bay Beach Report Card for Monterey Peninsula beaches, which reports water quality grades, or when relevant, weather advisories. An A to F grade is assigned based on the health risks of swimming or surfing at that location. Look at the "dry" grade for all days except those "wet" days during and within 3 days after a rainstorm. Click here for more information on the Beach Report Card. Click the name of the beach when it pops up for more details, or choose a beach below.

    AsilomarCarmelLovers PointMunicipal Wharf 2 (Monterey)Upper Del Monte Beach (Monterey)San Carlos Beach (Cannery Row)Stillwater Cove (Pebble Beach)Spanish Bay

    adapted from Heal the Bay, brc.healthebay.org
    subscribe via RSS