• Cone Zone Report June 7-14

    Here are the major scheduled road and lane closures for Monterey County from Sunday, June 7 through Sunday, June 14, 2015Please keep in mind that construction work is weather-dependent.

    Highway 1 – Salmon Creek: June 9 – June 10

    • Daytime drainage work along Highway 1 at Salmon Creek from 7 a.m. to 3:30 p.m.
    • Motorists should expect delays of approximately 10 minutes. 

    Highway 1 – South Coast: June 9 – June 12

    • Daytime drainage work along Highway 1 between the Big Creek Bridge and the Vincente Creek Bridge from 7:30 a.m. to 4 p.m.
    • Motorists should expect delays of approximately 10 minutes. 

    PG&E Gas Line Replacement Project – Highway 68: June 7 – June 13

    • Gas line replacement work will result in night time lane closures along eastbound and westbound Highway 68 between Olmsted Road and Toro Road from 8 p.m. to 5 a.m.
    • Motorists can expect delays of approximately 15 minutes

    Highway 101 – San Lucas: June 11 – June 12

    • Daytime sweeping along northbound and southbound Highway 101 between Route 198 and Lockwood/San Lucas Road from 8 a.m. to 3 p.m..
    • Motorists should expect delays of approximately 10 minutes. 

    Highway 101 – King City: June 9 – June 10

    • Daytime sweeping along northbound and southbound Highway 101 between Broadway and Jolon Road from 8 a.m. to 3 p.m.
    • Motorists should expect delays of approximately 10 minutes. 

    Highway 101 – Greenfield: June 7 – June 12

    • Daytime and night time pavement work along northbound and southbound Highway 101 at Espinosa Road.
    • Motorists should expect delays of approximately 10 minutes. 

    Highway 101 – San Juan Road Interchange Project: June 7 – June 12

    • Night time construction work along southbound and northbound Highway 101 between Dunbarton Road (South) and Cannon Road/Rocks Road from 7:30 p.m. and 5:30 a.m.
    • The southbound and northbound San Juan Road Interchange ramps will be subject to closure.
    • Motorists should expect delays of approximately 10 minutes. 

    Highway 183 – Salinas to Castroville: June 9

    • Daytime chip seal work along Highway 183 between San Jon Road and the Espinosa Slough Bridge from 6 a.m. and 6 p.m.
    • Traffic control consists of one-way reversing traffic control with flagging
    • Motorists should expect delays of approximately 15 minutes. 

    South Salinas: Westbound Blanco Road Closure 

    • Industrial wastewater pipe installation will result in the all-day closure of westbound Blanco Road between Blanco Circle and La Mesa Way.
    • Eastbound Blanco Road will be subject to daytime lane closures from 7 a.m. to 4 p.m.
    • Detour signs will be in place to help direct motorists.
    • Motorists should expect delays of approximately 15 minutes.

    posted to Cedar Street Times on June 5, 2015

    Topics: Front PG News

    Comments

    You must be logged in to post a comment.



  • Cedar Street’s Most Popular

  • Beach Report Card

    Loading...

    This is the Heal the Bay Beach Report Card for Monterey Peninsula beaches, which reports water quality grades, or when relevant, weather advisories. An A to F grade is assigned based on the health risks of swimming or surfing at that location. Look at the "dry" grade for all days except those "wet" days during and within 3 days after a rainstorm. Click here for more information on the Beach Report Card. Click the name of the beach when it pops up for more details, or choose a beach below.

    AsilomarCarmelLovers PointMunicipal Wharf 2 (Monterey)Upper Del Monte Beach (Monterey)San Carlos Beach (Cannery Row)Stillwater Cove (Pebble Beach)Spanish Bay

    adapted from Heal the Bay, brc.healthebay.org
    subscribe via RSS
    stay safe on the go: app for iOS or Android