• TAMC Cone Zone

    With bad weather forecast, some of these projects may not take place On the other hand, with bad weather forecast, there may be additional closures! Stay alert.

    Highway 1 – Multiple Locations: Feb. 10 – Feb 14 • Daytime drainage and tree work at multiple locations along Highway 1 between from 8:30 a.m. to 3:30 p.m.

    Locations are: Lime Creek Bridge to Garrapata Creek Bridge: Drainage work. Hurricane Point to Garrapata Ridge Road: Crack and Seal work. Peter Pan Road to Granite Canyon Bridge: Maintenance operation. Carmel Valley Road to Moss Landing Road: Sweeping operation. Iris Canyon Road, Aguajito Road, and Fremont Street: Guardrail repair. Motorists can expect delays of approximately 10 minutes.

    posted to Cedar Street Times on February 7, 2014

    Topics: Front PG News

    Comments

    You must be logged in to post a comment.



  • Cedar Street’s Most Popular

  • Beach Report Card

    Loading...

    This is the Heal the Bay Beach Report Card for Monterey Peninsula beaches, which reports water quality grades, or when relevant, weather advisories. An A to F grade is assigned based on the health risks of swimming or surfing at that location. Look at the "dry" grade for all days except those "wet" days during and within 3 days after a rainstorm. Click here for more information on the Beach Report Card. Click the name of the beach when it pops up for more details, or choose a beach below.

    AsilomarCarmelLovers PointMunicipal Wharf 2 (Monterey)Upper Del Monte Beach (Monterey)San Carlos Beach (Cannery Row)Stillwater Cove (Pebble Beach)Spanish Bay

    adapted from Heal the Bay, brc.healthebay.org
    subscribe via RSS
    stay safe on the go: app for iOS or Android